A Leak from the Neighbor Upstairs in Israel: Who Is Responsible for Repairing and Paying, the Apartment Owner or the House Committee?

קו אור מצייר טיפת מים בחדר מדרגות אבן ישן בלילה

By Adv. David Bodenheim, Partner, Head of Litigation | Published: October 20, 2026

Responsibility for a leak in an Israeli condominium is determined by one question: whom does the part from which the water escapes serve. A pipe that serves one apartment, including the point where it connects to the shared plumbing, is the responsibility of the owner of that apartment. A pipe, a main drain stack, a roof or an exterior wall that serves all or most of the residents is common property, and responsibility for it lies with the house committee (Va’ad Bayit). Whoever claims that the water comes from a particular apartment must prove it, and that usually means a professional leak detection report that also examined the apartment above.

Almost every apartment owner in Israel has at some point come across a stain on the ceiling or peeling plaster, and then an argument begins: the neighbor upstairs says “everything is dry at my place,” the house committee says “it is not ours,” and the insurance company wants to know whom to sue. This guide explains how the law and the courts allocate responsibility, how the source of the leak is proved, and where to turn when there is no agreement.

Key points

  • The test is functional: a part that serves one apartment belongs to the apartment, a part that serves everyone is common property. So Section 52 of the Land Law, 5729-1969 provides, and so the courts have interpreted it.
  • The point of connection between the apartment’s plumbing and the shared drain stack is regarded as part of the apartment. This is the point on which most disputes are decided.
  • An apartment owner must repair a defect in his or her apartment that harms another apartment, even without being at fault (Section 3 of the Model Bylaws).
  • Without a leak detection report that examined the suspected apartment, it is very hard to win. In 2025 a District Court dismissed a claim based on an inspection of the damaged apartment alone.
  • A dispute between apartment owners over common property is heard by the Superintendent of Land Registration, not in court.

What counts as common property and what belongs to the apartment?

Section 52 of the Land Law defines common property as “all parts of the condominium except the parts registered as apartments,” and expressly lists the roofs, the exterior walls, the foundation, the stairwells and the water installations “intended to serve all or most of the apartment owners, even if they are within a particular apartment.” The last words matter: a main drain stack that passes inside the wall of your apartment is still common property, because it serves everyone.

And what about the reverse, a part of the shared system that serves only one apartment? The Supreme Court held as early as 2006 (LCA 7828/06 Karshin v. Dan) that a drainpipe installed to serve one apartment only is part of that apartment, and that the accepted position in condominiums is that the part branching off the main installation to a particular apartment is not common property. Since then this has been the test: not where the pipe runs, but whom it serves.

Who owns the point of connection between the apartment’s plumbing and the shared plumbing?

This is the question that decides most cases, because most leaks begin exactly there: at the connection between the bathtub’s waste pipe and the drain stack, or at the T-joint between the shared hot water pipe and the apartment’s plumbing. The Tel Aviv District Court held in 2021 (Appeal 1601-05-21 Karin v. Radoshinsky) that this connection is part of the apartment’s infrastructure, because it is meant to serve it, and the fact that it is connected at its end to common property does not change its nature. All the infrastructure that serves an apartment, sewage, water and electricity, is private property in the part meant to serve it.

This approach was adopted again in March 2025 (CA 42959-10-24 House Committee of 147 Ben Gurion v. Migdal), when the District Court reversed a judgment that had placed responsibility on the house committee, and held that a failure in the connection between the shared plumbing and the private plumbing is the responsibility of the apartment owner. The Superintendents of Land Registration rule the same way even in cases in which the apartment owner does not use the sanitary fixture from which the leak comes at all: what decides is the location of the failure, not who set the flow in motion.

Allocation of responsibility in a condominium

Whose pipe is it?

The test: whom the part serves. One apartment: the apartment owner. All the residents: the house committee.

The apartment owner’s responsibility

Plumbing inside the apartment

Faucets, the toilet cistern, pipes under the flooring that serve the apartment only. The apartment owner’s responsibility, even without fault.

The connection point to the drain stack

The connection between the apartment’s plumbing and the shared pipe is part of the apartment. This is where most disputes are decided (Radoshinsky 2021, 147 Ben Gurion 2025).

A downpipe that serves one apartment

Even if it is outside the apartment: a part that branches off to serve a particular apartment belongs to it (Karshin 2006).

The house committee’s responsibility

Roof, exterior walls, waterproofing

Common property under Section 52. The repair is on the house committee, and the expense is divided among all the residents (Section 58).

Main drain stack, main water pipe

It serves everyone, and is therefore common property even when it passes inside the wall of a private apartment.

Not sure? A leak detection report

The suspected apartment and the shared systems are examined. Without it there is no proof of the source of the water.

The testResponsibility is allocated according to what the part serves: one apartment (the apartment owner) or all the residents (the house committee).

How do you prove where the water really comes from?

The basic rule is that the burden of proof is on the claimant: whoever sues must prove that the source of the leak is with the defendant. A stain on the ceiling below the neighbor’s bathtub is a reasonable suspicion, but it is not proof. In the 2025 judgment mentioned above, the insurance company relied on a leak detector who examined only the damaged apartment and did not enter the apartment above. The court held that such an inspection proves nothing about the source of the water, and the claim against the house committee was dismissed.

The practical conclusion: a leak detection report should be prepared by a professional with equipment (a thermal camera, pressure testing, tracer dye), include an inspection of the suspected apartment and of the shared systems, and reach a reasoned conclusion on the point of failure. A report that says only “the damp comes from above” is not enough.

And what if the neighbor refuses to let an inspector in? In 2016 the Supreme Court upheld (LCA 1998/16 Sharon v. Bondiz) a decision of a Superintendent that required an apartment owner to open up the flooring in her bathroom to allow an expert to locate the leak, by virtue of Section 3 of the Model Bylaws. In that case it was also held that opening the flooring when the expert was not present did not help the apartment owner, because it was impossible to know what the situation had been before. A refusal to cooperate with an inspection is counted against the party refusing.

What are the duties of the owner of the apartment from which the leak comes?

Section 3(b) of the Model Bylaws in the Schedule to the Land Law provides that an apartment owner is entitled to demand that the owner of another apartment carry out a repair in the other apartment, where failure to carry it out may harm his or her apartment. This duty does not depend on fault: even if the pipe wore out from age and not because of negligence, the duty to repair exists. So once there is a finding pointing to your apartment, the right thing is to repair quickly and document, not to argue about blame.

The separate question is compensation for the damage already caused to the neighbor: painting, plaster, damaged furniture. Here the court also looks at conduct: whether the apartment owner acted immediately on learning of the problem, called in a professional, cooperated with the inspections. Whoever repaired quickly and documented everything is in a far better position than someone who ignored messages for months.

And what if the source is in the common property?

When the failure is in the main drain stack, the roof, the exterior wall or a pipe that serves all the residents, Section 3(a) of the Model Bylaws allows the affected apartment owner to demand that the house committee carry out the repair, and the costs of the repair are divided among all the apartment owners under Section 58 of the Land Law. The house committee cannot evade this by arguing that there is no money in the fund.

There is a common trap here: a resident who repairs a defect in the common property himself and then demands reimbursement. The Supreme Court has held (LCA 4984/17 Haim v. House Committee of the Condominium at 48 Sokolov) that the proper course is to approach the house committee with a demand to repair, and if it refuses, to sue it before the Superintendent. Reimbursement for a self-made repair will be given only under cumulative conditions: the defect is indeed in the common property, it was preceded by a demand to the house committee that was refused, waiting for the proceeding would have aggravated the damage, the repair was necessary and properly carried out, and the cost is reasonable.

Table: who is responsible in the common cases

Source of the leakWho is responsible for the repairComment
A pipe, tap or fitting inside the apartment that serves only that apartmentThe apartment ownerIncluding plumbing under the flooring of that apartment
The point of connection between the apartment’s plumbing and the shared drain stackThe apartment ownerHeld in the Radoshinsky case (2021) and the 147 Ben Gurion case (2025)
A main drain stack, a main water pipe, a shared rainwater drainpipeThe house committeeEven when the pipe passes inside a private apartment
A roof, an exterior wall, exterior waterproofingThe house committeeUnless the agreed bylaws provide otherwise (for example an attached roof)
A drainpipe or pipe that serves one apartment onlyThe owner of that apartmentHeld in the Karshin case (2006)
A balcony or roof attached to an apartment that also serves as the ceiling of another apartmentDepends on the bylaws and on the source of the failureAn individual check of the condominium registration order is required

Where do you turn: the Superintendent of Land Registration or the court?

Sections 72 to 74 of the Land Law give the Superintendent of Land Registration exclusive jurisdiction to hear disputes between apartment owners in a condominium concerning their rights and obligations under the bylaws, including a demand to repair a defect in the common property or in another apartment. The proceeding before the Superintendent is relatively quick and inexpensive, the Superintendent may appoint an expert and visit the building, and can also award monetary compensation for the damage caused by the defect.

A purely monetary claim for damage, mainly when the plaintiff is an insurance company suing by way of subrogation whoever caused the damage, is filed in the Magistrates’ Court or the Small Claims Court. There too the tests are the same: whom the failed part serves, and what was proved about the source of the water.

What to do in practice, on both sides

If the water is reaching you

  1. Photograph and document immediately, including dates, and send a written notice to the neighbor and to the house committee.
  2. Order a leak detection report that also examines the suspected apartment and the shared systems. Ask in advance that the neighbor allow entry.
  3. Notify the apartment’s insurance company. An ordinary building policy usually covers the damage to your apartment, and the company will itself sue whoever is responsible.
  4. If there is no cooperation, file a claim with the Superintendent of Land Registration demanding repair and compensation.

If it is claimed that the water comes from you

  1. Do not ignore it and do not refuse an inspection. A refusal counts against you.
  2. Bring in a professional of your own to examine the apartment and write a report. If the source is with you, repair at once and document the repair.
  3. If the report points to a shared drain stack or to another apartment, pass it on in writing to the neighbor and to the house committee, and demand that the house committee deal with it.
  4. Keep all the correspondence. Your conduct after you learned of the problem is what will determine whether you are ordered to pay compensation.

If you live abroad

An owner abroad usually hears of a leak from a tenant or a neighbor, sometimes months late. You do not need to fly in: our office can arrange the inspection, correspond with the neighbor, the house committee and the insurer, and represent you before the Superintendent of Land Registration.

Frequently asked questions

The neighbor upstairs says everything is dry at his place. Does that release him?

No. Damp that comes from plumbing under the flooring is not always visible in the apartment it comes from. The way to find out is a leak detection report that examines the apartment above, and if the neighbor refuses to allow an inspection, the Superintendent of Land Registration can order him to allow it and even to open up flooring.

The house committee argues that it has no money to repair the drain stack. What do we do?

Lack of budget is not a defense. Section 58 of the Land Law requires all the apartment owners to share in the expenses of maintaining the common property, and the house committee may collect a special payment. The house committee can be sued before the Superintendent, and an order obtained requiring it to carry out the repair.

I repaired the shared pipe myself. Am I owed reimbursement from all the residents?

Only if you first approached the house committee with a demand to repair, it refused, waiting would have aggravated the damage, the repair was necessary and properly carried out and the cost is reasonable. These are the conditions the Supreme Court set. Without a prior demand to the house committee, the chance of reimbursement is low.

My insurance paid me for the damage. Is that the end of the story?

For you, usually yes, but the insurance company may sue by way of subrogation whoever is responsible for the leak, whether that is the neighbor or the house committee. If you are on the other side, a subrogation claim can arrive a year or two after the event, so it is important to keep the documentation of the repair.

Can one also sue for distress?

Yes, the courts and the Superintendents sometimes award compensation for distress and loss of enjoyment of the apartment, mainly when the leak lasted a long time and the responsible party ignored approaches. The amounts are usually modest relative to the cost of the repair, but the conduct of the responsible party affects them greatly.

A leak that turned into a dispute? This is the time for advice

Our firm represents apartment owners and house committees in Israel in damp disputes and in proceedings before the Superintendent of Land Registration and in the courts, including analysis of leak detection reports, third-party notices and subrogation claims by insurance companies. We represent clients throughout Israel and abroad, mostly by phone and video.

For an initial consultation: +972-2-509-0170
Adv. David Bodenheim, Partner at Bodenheim Gabriel & Co., leads the firm’s complex litigation and civil and commercial disputes practice. A graduate of the litigation department of Herzog Fox & Neeman, he represents apartment owners and house committees in condominium disputes, in proceedings before the Superintendent of Land Registration and in the courts. Our litigation practice. Bodenheim Gabriel & Co., 214 Jaffa Street, Jerusalem.

This article is intended for general information only and does not constitute legal advice or a substitute for it. Each case is examined according to its circumstances, the condominium registration order and the applicable bylaws. Last updated: October 2026.

Main sources

  • Land Law, 5729-1969, Sections 52, 58 and 72 to 74, and Section 3 of the Model Bylaws in the Schedule
  • LCA 7828/06 Karshin v. Dan (Supreme Court, November 12, 2006)
  • LCA 1998/16 Sharon v. Bondiz (Supreme Court, May 11, 2016)
  • LCA 4984/17 Haim v. House Committee of the Condominium at 48 Sokolov St., Kiryat Ata (Supreme Court, December 14, 2017)
  • Appeal (Tel Aviv District Court) 1601-05-21 Karin v. Radoshinsky (September 19, 2021)
  • CA (Tel Aviv District Court) 42959-10-24 House Committee of 147 Ben Gurion St., Bat Yam v. Migdal Insurance Company (March 18, 2025)