By Adv. David Bodenheim, Partner, Head of Litigation | Published: October 21, 2026
Not every neighbor may object to every permit. If the application includes a relief (Hakala) or a non-conforming use, the owners and holders of the adjoining properties receive notice, and they have 15 days to object (Section 149 of the Planning and Building Law). If you are co-owners in the same building or on the same parcel, the applicant needs your consent or must send you notice, and then too there are 15 days (Regulations 36 and 37 of the Licensing Regulations). A permit that conforms to the zoning plan on a neighboring lot is not open to objection. And since 2025 the reliefs themselves have been greatly narrowed: as a rule, additional floor area, apartments or floors can no longer be obtained by way of relief.
In Jerusalem these questions come up all the time: older buildings built under plans that are decades old, additions on the roof, protected rooms (Mamad) beyond the building line and dense streets where every meter affects the neighbor. This article explains how to identify which situation you are in, what can still be approved by way of relief, how the Appeals Committee in Jerusalem decides, and what to write in an objection.
The neighbor is applying for a permit
Are you allowed to object?
Three situations, three different rules.
A relief or a non-conforming use
Section 149 of the Planning and Building Law
Co-owners in the same building or parcel
Regulations 36-37 of the Licensing Regulations
A plan-conforming permit on a neighboring lot
AAA 1461/20 Antrim (Supreme Court)
The first question is not “does the construction bother me” but which application was filed and what your connection to the property is. The answer determines whether there is any proceeding at all in which you can be heard.
| The situation | Who may object | The deadline | The source |
|---|---|---|---|
| The application includes a relief or a non-conforming use | Owners and holders of the property and of the adjoining properties, and anyone the committee believes may be harmed | 15 days from publication, and for whoever received personal notice, from the day it was delivered | Section 149(a) |
| You are co-owners in the same building or parcel and did not sign the application | A holder of a right in the land, such as an apartment owner in a condominium or an owner in undivided co-ownership (Musha) | 15 days from receipt of the notice | Regulations 36 and 37 |
| A plan-conforming permit on a neighboring lot | There is no right to object | The objection should have been made at the plan stage | AAA 1461/20; Sections 100 and 102 |
| A small deviation that the licensing authority approves without a relief, such as exceeding the side or rear setback by up to 7% | There is no objection proceeding | An approach to the committee, and if necessary a petition | Section 145(b)(2); Regulation 6 |
Until recently a relief was the accepted way to add a floor, building percentages or an apartment to a building. The reform reversed the default: the local committee may grant a relief only in the matters prescribed in regulations, and they will not include the addition of floor area, housing units or floors (Section 151(b)(1)). For a plan that it was decided to deposit from January 1, 2023, the rule applies immediately, and for older plans it applies to applications filed from January 1, 2025. Earlier applications continue under the old rules (Regulation 8 of the Relief Regulations).
The permitted matters are listed in Regulation 4 of the Planning and Building (Relief, Non-Conforming Use and Deviation from a Plan) Regulations, 5783-2023, and most of them are narrow: a front building line according to the majority of the buildings on the street; a protected room, a shelter, an elevator shaft or emergency stairs as an addition to an existing building beyond the building lines; accessibility adjustments; and a reduction of parking under the parking regulations. For an existing building whose construction was completed eight years or more before the application, a wider track remains, provided there is no substantial deviation (Section 147(b)). In a plan deposited after August 1, 1989, any addition to the total floor area is a substantial deviation (Section 151(b)(2)).
And there are deviations that do not reach the neighbors at all. The licensing authority may approve, without a relief proceeding and without publication, deviations whose effect is “slight and negligible” according to an opinion of the committee engineer (Section 145(b)(2)), for example exceeding the side or rear setback by up to 7%, or up to 5% in site coverage (Regulation 6).
After the reform of reliefs, which came into force in stages up to 2025
Relief from a plan: what can still be requested today
What is allowed by way of relief, what is forbidden, and what is approved without publication.
Allowed by way of relief
Regulation 4 of the Relief Regulations, 2023
Not by way of relief
Sections 151(b)(1) and 147(b)
Without a relief and without an objection
Section 145(b)(2), Regulation 6
The practical meaning: when a notice of a relief arrives, first check whether the committee is competent to approve it at all. A relief that is not on the list, or that involves a substantial deviation, is a question of authority and not of discretion, and that is an objector’s strongest argument.
Four considerations recur in the decisions of the Jerusalem District Appeals Committee: planning justification, the extent of the relief, the age of the plan (an older plan justifies more flexibility) and the harm to the neighbors and the public. “The more significant the extent of the reliefs requested, the more the scales tip against approving them” (Appeal (Jerusalem) 1021/23). Three decisions illustrate this. Two were given under the rules that preceded the reform, but the considerations hold today as well.
What emerges from this? General arguments about view and light in a dense neighborhood rarely succeed. What works is concrete harm proven by an expert opinion, the absence of planning justification, an accumulation of reliefs, and defects in the proceeding itself. It is therefore worth asking the committee for the minutes and the professional opinions, and not only for the decision.
Mistakes that recur: a general objection without detail; an argument of loss of value without an appraiser’s opinion; proprietary arguments alone when the application concerns a neighboring lot; an objection to construction of a kind the objector himself benefited from in the past; and missing the deadline.
An application for a permit requires the consent of the holders of rights in the land: in a condominium the apartment owners or the house committee (Va’ad Bayit), and in land that is not a condominium the registered owners (Regulation 36(f)). Whoever did not consent receives notice and may object within 15 days (Regulations 36(b) and 37), and the licensing authority must decide on the objection in a reasoned decision (Regulation 43).
The planning institutions do not decide proprietary questions, but they may hold up an application that lacks “proprietary support,” for example building on a roof that remained common property (AAA 2832/09 Givatayim v. Bnei Eliezer). The applicant must show a “reasonable proprietary possibility.” And note the rule in the Land Law: “An owner of an apartment that was extended shall be regarded as having consented to a similar extension of any other apartment in the same building” (Section 71B(c)). Thus, in French Hill the Appeals Committee rejected an objection to a protected room on the common property, among other reasons because some of the objectors had themselves extended their apartments, and it regarded protection as a public interest “of the first order” (Appeal (Jerusalem) 1030/24). On a building that is not registered as a condominium, see our article on a building in undivided co-ownership (Musha).
At the permit stage, usually not. In AAA 1461/20 Antrim (2021), a developer applied for a plan-conforming permit for a hotel in Ein Kerem, and the neighborhood committee objected. The Supreme Court held that only a holder of a right in the land who received notice may object to such an application. The place where anyone who may be harmed is entitled to object is the deposit of the plan, within two months (Sections 100 and 102). As Amnon Lehavi explains, only when the permit deviates from the plan does a right of objection open to the neighbors at the licensing stage. He also notes that compensation under Section 197 applies to harm from a plan and not to harm from a relief on an adjacent lot. So against a neighbor’s relief, the objection is usually your main protection.
If the permit in fact departs from the plan, that is an argument about its legality: you approach the committee engineer, and if necessary consider an administrative petition within 45 days and without delay (Regulation 3 of the Administrative Affairs Courts Regulations). And whoever wants to have an influence early needs to follow the plans deposited in the neighborhood. See objecting to a zoning plan.
Check in the building file whether there is a permit and what it allows. If there is none, or the construction departs from it, contact the enforcement unit of the local committee with dated photographs. The chairman of the committee, the committee engineer or the National Enforcement Unit may issue an administrative stop-work order, and in an urgent case a temporary order for five days (Section 216). Whoever is harmed by the order may apply to have it set aside within 15 days, but the application itself does not stay its execution (Section 228). And if the neighbor asks to legalize after the fact construction he has already carried out, the Supreme Court has emphasized that such an application must be examined “with seven eyes,” that is, with the greatest care (AAA 3319/05 Ponte). For building on the common property there is also a proprietary route before the Superintendent of Land Registration or the court (Section 72 of the Land Law). What you do not do: physically block the works.
A neighbor who wants to object to a relief or a non-conforming use
From the notice to the court
The timetable of an objecting neighbor.
Start
Notice
Publication in a newspaper, a sign on the facade and a letter to the owners and holders of the adjoining properties.
Section 149(a)
15 days
15 days to object
From the day the notice was delivered, or from publication. In writing and with planning reasons.
Section 149(a), Regulation 37
Hearing
The committee’s decision
A hearing on the objection. The decision is sent by registered mail.
Section 149(a)(3)
30 days
Appeal
30 days from service of the decision. The Appeals Committee decides within 30 days.
Section 152(a)(1), (c)
Up to 45 days
Administrative petition
Up to 45 days, without delay. It examines legality, not planning.
Regulation 3
Our office can file the objection, appear before the committee and the Appeals Committee and handle the proceeding on your behalf, under a power of attorney signed before an Israeli consul, or before a local notary with an apostille.
In most cases 15 days: for a relief or a non-conforming use, from the day the notice was delivered (Section 149(a)), and when you are co-owners of the land, from the day the notice was received (Regulation 37). Do not wait until the end of the period.
In applications to which the reform applies, no (Section 151(b)(1)). For a building whose construction was completed at least eight years earlier there is a wider track, but without a substantial deviation (Section 147(b)). And applications under older plans that were filed before 2025 may be handled under the previous rules.
A protected room as an addition to an existing building is a matter that may be approved by way of relief (Regulation 4), and the Appeals Committee in Jerusalem gives it great weight. An objection aimed at preventing it altogether has low prospects. What can be achieved is a change of location, shape or openings, mainly when a concrete alternative is presented with a drawing.
The Law requires notice to the owners and holders of the adjoining properties (Section 149(a)(2A)). Contact the committee immediately in writing, state that you did not receive notice and ask for your objection to be heard. If a decision has already been given, an appeal or a petition should be examined without delay.
An appeal to the Appeals Committee within 30 days of the day the decision was served (Section 152(a)(1)). The Appeals Committee examines the matter anew, and its decision replaces the decision of the local committee. See appealing a decision of the local committee.
Yes, if the objection was filed in bad faith and is vexatious and frivolous. On the other hand, when the objection is justified, the developer can be ordered to pay the objector’s costs (Section 106(d)).
Our firm represents apartment owners, neighbors and neighborhood committees in objections to reliefs and non-conforming uses, in appeals and in administrative petitions, and also permit applicants who need to respond to objections. We represent clients throughout Israel and abroad, mostly by phone and video.
For an initial review: +972-2-509-0170This article is intended for general information only and does not constitute legal advice or a substitute for it. The deadlines and rules depend on the type of application, the date it was filed and the applicable plan, and each case is examined on its circumstances. Last updated: October 2026.