Buying an Apartment in Israel from Abroad: The Notarized Power of Attorney, Purchase Tax for Foreign Residents and New Immigrants, and How to Close a Deal Without Flying In

קו אור יחיד מצייר בלילה קשת ארוכה שמגיעה מרחוק אל בית קטן עם חלון אחד, מעל גגות כיפה בירושלים, להמחשת רכישת דירה בישראל מחו״ל

By Adv. Mike Gabriel, Partner, Head of Real Estate | Published: November 9, 2026

You can buy an apartment in Israel without coming here: the contract, the tax filing, the mortgage, the registration, all of these are done through a lawyer in Israel acting under a power of attorney. But a power of attorney signed outside Israel must be signed before an Israeli consul, or before a local notary with an apostille, otherwise the Land Registry (Tabu) will not accept it. And on tax the gap is wide: a foreign resident pays purchase tax (Mas Rechisha) of 8 percent from the first shekel and 10 percent above about NIS 6 million, while an Israeli resident buying a single apartment is exempt up to about NIS 1.98 million. Someone planning to immigrate is treated as an “Israeli resident” for this purpose if he or she immigrated within two years of the purchase, and a new immigrant (oleh) is entitled to a further benefit. This is how a remote transaction is built so that it does not get stuck at registration, and does not cost more in tax than the law requires.

A large share of the buyers our firm accompanies are not in Israel during the transaction: families from the United States, France and England buying an apartment ahead of Aliyah, for children studying here or as an investment, and Israelis living abroad who are coming back. Working with them differs from an ordinary transaction in three ways: identification and signatures are done remotely and demand formal precision, the question of residency determines the tax, and the money arrives from an account abroad, which requires early coordination with the bank in Israel. Whoever deals with these three at the outset closes a smooth transaction. Whoever does not finds out on the day the Land Registry returns the file.

Key points

  • A power of attorney to carry out a real estate transaction that requires registration is valid only if a notary drew it up or verified the signature on it (Section 20(a) of the Notaries Law, 5736-1976). The exception for a lawyer (Section 91 of the Bar Association Law, 5721-1961) applies only to a power of attorney “given in Israel.”
  • A document signed abroad is proved in Israel if it was signed before an Israeli diplomatic or consular representative, or before a local notary whose signature has been authenticated (Section 30 of the Evidence Ordinance). In countries that are parties to the Hague Convention, an apostille replaces consular authentication.
  • Purchase tax for a foreign resident and for anyone who already owns an apartment: 8 percent up to NIS 6,055,070 and 10 percent above that (Section 9(c1f), a temporary provision that has been extended). For an Israeli resident buying a single apartment: 0 percent up to NIS 1,978,745, and then 3.5, 5, 8 and 10 percent in brackets. The amounts are not updated in 2025 through 2027.
  • “Israeli resident,” for the single-apartment brackets, includes “anyone who within two years of the day of purchase of the apartment became an Israeli resident for the first time or a veteran returning resident.” For an apartment bought from a developer, the Jerusalem appeals committee held in May 2025 that the two years are counted from the date of delivery.
  • A new immigrant who buys a single residential apartment between one year before immigrating and seven years after: 0 percent up to NIS 1,978,745, 0.5 percent up to NIS 6,055,070, and above that the ordinary brackets. The benefit is given once (Regulation 12A, from 2024).
  • On the sale side: a foreign resident is entitled to the capital gains tax exemption for a qualifying residential apartment only if he or she has no apartment in the country of residence, and must produce a certificate from the tax authorities there. Without the certificate, the Law presumes that he or she has an apartment.

How do you sign a transaction when you are not in the country?

Two stages need to be separated. The contractual stage, signing the sale agreement, does not require a notarized power of attorney: the Supreme Court held in Gold v. Maoz that Section 20(a) of the Notaries Law applies to a power of attorney “to carry out” the transaction, that is, to register it at the Land Registry, and not to an authorization to sign a contract. In practice, many buyers sign the contract themselves, by digital signature or by circulating the documents, and the lawyer in Israel exchanges drafts with them. The property stage, signing the deed of sale, the application to register a caveat (warning note) and the bank documents, is the stage at which a lawful power of attorney is required, because the parties must appear before the Registrar or before a lawyer who will identify them, explain the transaction to them and verify their signature (Regulations 12, 14 and 16 of the Land (Management and Registration) Regulations), and whoever is not here does so through an agent.

Section 20(a) of the Notaries Law provides that “a general power of attorney and a power of attorney to carry out transactions in land that require registration in the land register shall not be valid unless a notary drew them up or verified the signatures on them.” A power of attorney given to a lawyer in Israel has an exception in Section 91 of the Bar Association Law: it is enough that the lawyer certified the client’s signature. But the section speaks expressly of a power of attorney “given in Israel,” so when the client signs in New York or in Paris, the exception does not help. Two routes remain, and they are set out in Section 30 of the Evidence Ordinance: signing before “an Israeli diplomatic or consular representative,” that is, at the consulate, or signing before a local notary public whose certification is authenticated. In the past this authentication required a chain: notary, the local foreign ministry, the Israeli consulate. The Hague Convention of 1961, to which Israel has been a party since 1978, replaced the chain with a single certificate, the apostille, issued by the competent authority in the country where the document was signed. In countries that are not parties to the Convention, the consulate route remains.

Three mistakes we see again and again. The first: a power of attorney signed before an American notary without an apostille, because “the notary said it was enough.” The second: an apostille on the translation instead of on the document, or a power of attorney in English without a notarized translation into Hebrew. The third: an old general power of attorney held by a relative, which does not expressly authorize buying the particular apartment, signing deeds and undertaking a mortgage. A power of attorney for a transaction is written for the transaction: the name of the buyer, the details of the property, the authority to sign the agreement, the declarations to the real estate taxation office, the bank documents and the deeds of sale, and it is irrevocable when it is also given to secure the rights of the seller or the bank. We wrote about the checks on the property itself, which are carried out in the same way from a distance, in our guide to the pre-purchase checks.

How much purchase tax does a foreign resident pay?

The Real Estate Taxation Law distinguishes between two groups. The first is “an individual who is an Israeli resident” buying an apartment that is his or her “single apartment” in Israel, or who will sell the previous apartment within 24 months (and for an apartment from a developer, within 12 months of the contractual delivery). This group benefits from the brackets in Section 9(c1c)(3): 0 percent up to NIS 1,978,745, 3.5 percent up to NIS 2,347,040, 5 percent up to NIS 6,055,070, 8 percent up to NIS 20,183,565, and 10 percent above that. The second group is everyone else: those who already own an apartment, companies, and foreign residents. They are subject to the temporary provision in Section 9(c1f), which has been extended: 8 percent up to NIS 6,055,070 and 10 percent above that. On an apartment of NIS 3 million, the difference is between about NIS 45,000 and about NIS 240,000. Section 9(c2) provides that the amounts are not updated in the 2025 through 2027 tax years, so these amounts also apply to a transaction signed now.

The deciding question is therefore residency, not citizenship: an Israeli citizen who lives abroad and whose center of life is there is a foreign resident for tax purposes. And the Law has an important opening for anyone planning to immigrate or to return: for the single-apartment brackets, “Israeli resident” is defined as “including anyone who within two years of the day of purchase of the apartment became an Israeli resident for the first time or a veteran returning resident.” In other words, you can buy as a foreign resident, pay the full tax under the self-assessment, and after immigrating apply for an amended assessment and a refund. The appeals committee at the Jerusalem District Court widened this in May 2025: a resident of the United States bought an apartment off-plan in 2017 and immigrated only at the end of 2020, three years and three months after signing, because delivery of the apartment was delayed, among other things because of COVID-19. The committee held that for an apartment from a developer the two years should be counted from the date construction was completed and the apartment delivered, and alternatively that Section 107 of the Law allows the Director to extend the time where there is “sufficient cause,” and a sincere intention to immigrate is such a cause. The appeal was allowed in full and the tax was refunded. This is a ruling of an appeals committee, not a binding precedent of the Supreme Court, but it is reasoned and deals with a very common situation.

A new immigrant is entitled to a further track, which was updated in 2024. Regulation 12A of the Purchase Tax Regulations provides that an immigrant (someone holding an immigrant’s visa, an immigrant’s certificate or an A-1 visa) who buys a residential apartment that is his or her single apartment, within a period that begins one year before entering Israel and ends seven years after, will pay 0 percent up to NIS 1,978,745, 0.5 percent up to NIS 6,055,070, and above that the ordinary single-apartment brackets. The benefit is given only once, does not apply to an apartment worth more than NIS 20,183,565, and for an apartment under construction the construction period is not counted, subject to conditions. When spouses buy together and one of them is an immigrant, the immigrant is treated as buying alone. The old benefit in Regulation 12 (0.5 percent) has remained since 2024 for business premises only.

Purchase tax on an apartment in Israel, 2026

Three tracks, the same apartment

Under Section 9 of the Real Estate Taxation Law and Regulation 12A of the Purchase Tax Regulations. The amounts are frozen for 2025 through 2027.

01Foreign resident

8% from the first shekel

  • 8% up to NIS 6,055,070
  • 10% above that
  • Also applies to an Israeli resident who owns another apartment
  • Israeli citizenship does not matter; the center of life does

Section 9(c1f)

02Israeli resident, single apartment

0% up to NIS 1,978,745

  • 3.5% up to 2,347,040
  • 5% up to 6,055,070
  • 8% up to 20,183,565, and 10% above
  • Includes anyone who becomes a resident within two years of the purchase (Eisler: for an apartment from a developer, from delivery)

Section 9(c1c)(2)-(4)

03New immigrant, single apartment

0%, then 0.5% up to NIS 6,055,070

  • 0% up to 1,978,745
  • 0.5% up to 6,055,070
  • Above: the single-apartment brackets
  • From one year before immigrating to 7 years after; once only

Regulation 12A (2024)

In practiceOn an apartment of NIS 3 million: about 240,000 for a foreign resident, about 45,000 for an Israeli resident buying a single apartment, about 5,000 for a new immigrant.

What about the money, the mortgage and the seller’s tax?

Transferring the money. The bank in Israel that receives a transfer from abroad for the purchase of an apartment will require, under the anti-money-laundering rules, a declaration of the source of the funds and documents supporting it: pay slips, confirmation of the sale of an asset, tax returns, inheritance documents. Whoever has not prepared for this finds the money “stuck” at the bank for two weeks while a payment date in the contract approaches. So the process with the bank is opened when the contract is signed, not the day before the payment, and the contract sets payment dates that leave a margin. Mortgage. Banks in Israel give mortgages to foreign residents, usually at a lower loan-to-value ratio than for residents, and require translated income documents and sometimes an Israeli guarantor. Here too the bank documents are signed under a notarized power of attorney or at the consulate. Advance on capital gains tax. Section 15 of the Real Estate Taxation Law requires the buyer to transfer to the Director, out of the payments to the seller and after more than 40 percent of the price has been paid, an advance on account of the seller’s capital gains tax: 7.5 percent of the price (or 15 percent if the seller bought before November 2001). This is the buyer’s obligation, and it is what makes it possible to obtain the tax clearances for registration.

And on the day you sell. A foreign resident is liable for capital gains tax (Mas Shevach) like any seller, but the exemption for a qualifying residential apartment in Section 49A(a) is given to “an Israeli resident, or a foreign resident who has no residential apartment in the country in which he is resident,” and the Law sets a presumption: “a foreign resident shall be regarded as having a residential apartment in the country in which he is resident, as long as he has not produced a certificate from the tax authorities of that country that he has no such apartment.” Such a certificate is not always easy to obtain, and in some countries there is no authority that issues it. Whoever buys today as an investment should know that on a sale he or she may be liable for capital gains tax even on a single apartment in Israel, and it is worth planning for this in advance, for example in the question of in whose name the apartment is registered.

The stageWhat is required when the buyer is in IsraelWhat is required when the buyer is abroad
Signing the sale agreementSigning before the lawyerSigning personally from a distance, or a power of attorney; identification by a valid passport
Power of attorney to the lawyerCertification of the signature by the lawyer (Section 91)An Israeli consulate, or a local notary with an apostille (Section 30 of the Evidence Ordinance; the Hague Convention)
Declaration to the real estate taxation officeWithin 30 days of the day of signing, by the lawyer under the power of attorney (Section 73)
Purchase taxAccording to residency and the number of apartments8%/10%, unless the buyer becomes a resident within two years or qualifies as a new immigrant
Transferring the moneyAn ordinary bank transferA source-of-funds declaration and documents for the bank; coordinating dates in advance
Deed of sale and registrationSigning before a lawyer or the RegistrarSignature of the attorney-in-fact under a valid notarized power of attorney
A future saleSingle-apartment exemption on the conditions of the ChapterExemption only with a certificate that there is no apartment in the country of residence (Section 49A)

Closing a transaction from a distance: seven steps

  1. Define your residency and your plans. Whether you plan to immigrate, when, and whether you own another apartment in Israel. This determines the tax, the best time to buy and the question of in whose name to register.
  2. Sign the right power of attorney at the start. A power of attorney specific to the transaction, irrevocable as far as required, in Hebrew with a translation, signed at the consulate or before a notary with an apostille. The original is sent to Israel by courier.
  3. Carry out all the checks as usual. Land Registry extract, building file, permits, debts, the identity of the seller. Distance is not a reason to skip any of them, and it is a reason to ask for someone to visit the apartment on your behalf as well.
  4. Open the process with the bank early. An account in Israel or a transfer arrangement, a source-of-funds declaration, and if there is a mortgage, approval in principle before signing.
  5. Build a payment schedule with margins. Every payment from abroad takes time. Dates that are too tight are the sure way to a delay and to late-payment interest.
  6. Report and pay tax on time. A declaration within 30 days, purchase tax under the self-assessment, the capital gains tax advance to the Director out of the payments, and an application for an amended assessment after immigrating if that falls within the two years.
  7. Complete the registration and do not stop at the caveat. A buyer who is not in the country tends to forget the final registration. Make sure the lawyer completes the registration of ownership, and obtain an extract in which you are the owner.

Frequently asked questions

I am an Israeli citizen who has lived in the United States for ten years. Am I an “Israeli resident” for purchase tax?

No. The test is residency under the Income Tax Ordinance, that is, the center of life, and not citizenship. You will pay 8 percent, unless you return to Israel within two years of the purchase and meet the definition of a “veteran returning resident,” in which case you can apply for an amended assessment and a refund. Planning the date of purchase against the date of return is worth a great deal of money.

Can I sign the power of attorney before an Israeli lawyer who happens to be abroad?

Not for the purposes of registration. The exception in Section 91 applies to a power of attorney “given in Israel.” A signature outside Israel must be made at an Israeli consulate or before a local notary with an apostille. Even when the Israeli lawyer is a notary, his or her notarial certification is given in Israel; outside Israel one works with the consulate or with a local notary.

I bought an apartment from a developer and will immigrate only when it is delivered, in three years. Have I lost the benefit?

Not necessarily. The Jerusalem appeals committee held in 2025 that for an apartment from a developer the two years begin from the date construction is completed and the apartment delivered, and that even when the time has passed an extension can be sought under Section 107 for “sufficient cause.” Regulation 12A for new immigrants also does not count the construction period, subject to conditions. It is important to document the intention to immigrate in real time and to file the applications on time.

My parents abroad want to buy me an apartment in Israel and register it in their names. Is that wise?

It depends on the purpose. Registration in the names of parents who are residents abroad means purchase tax of 8 percent and, in the future, capital gains tax without an exemption, unless they prove that they have no apartment in their country of residence. Registration in your name as an Israeli resident buying a single apartment saves most of the tax, but raises questions of gift, of protecting the investment and of a future divorce. We wrote here about an apartment from the parents in a divorce. The decision is made after a calculation, not out of habit.

I am abroad and have no Israeli ID number. How is the report to the real estate taxation office made?

A foreign resident receives a taxpayer number from the Israel Tax Authority for the purpose of the report, and the lawyer handles this as part of the declaration. The same applies with the bank and with the Land Registry, where identification is by a valid passport. This is another stage that takes time, so it is started when the contract is signed.

Buying an apartment in Israel while you are not here?

We will build the transaction so that it goes through smoothly. Our firm accompanies buyers from abroad and new immigrants through every stage of the transaction: planning the tax according to residency and the date of Aliyah, drafting powers of attorney for signature at the consulate or before a notary with an apostille, the checks on the property, coordination with the bank for the transfer of funds and the mortgage, reporting to the real estate taxation office, applications for an amended assessment after Aliyah, and registration of ownership through to the end. We work in Hebrew and in English, by video call and with digital documents, and we know the requirements of the consulates and the banks. In the first conversation we will build with you the timetable and the list of documents required. We represent clients throughout Israel and abroad, mostly by phone and video.

For an initial conversation: +972-2-509-0170
Adv. Mike Gabriel, Partner, Head of Real Estate at Bodenheim Gabriel & Co., leads the firm’s real estate work: sale and purchase transactions, real estate taxation, buyers of apartments from developers, co-ownership and partition, inheritance and registration. Our real estate practice. Read also: Paying a Developer: Index Linkage and Late-Payment Interest and Bought an Apartment That Is Still Not Registered in Your Name? Bodenheim Gabriel & Co., 214 Jaffa Street, Jerusalem.

This article is intended for general information only and does not constitute legal advice or tax advice or a substitute for them. The tax rates and amounts are correct as of the date of publication according to the wording of the Law, and residency is examined according to each person’s circumstances. Last updated: November 2026.

Main sources

  • Real Estate Taxation (Capital Gains and Acquisition) Law, 5723-1963, Sections 9(c1c), 9(c1f), 9(c2), 15, 49A, 73 and 107
  • Real Estate Taxation (Capital Gains and Acquisition) (Purchase Tax) Regulations, 5735-1974, Regulations 12 and 12A
  • Notaries Law, 5736-1976, Section 20; Bar Association Law, 5721-1961, Section 91; Evidence Ordinance [New Version], 5731-1971, Section 30; Regulations Implementing the Hague Convention (Abolishing the Requirement of Legalisation for Foreign Public Documents), 5737-1977
  • Land (Management and Registration) Regulations, 5772-2011, Regulations 9, 12, 14 and 16
  • CA 624/88 Gold v. Maoz, 44(1) PD 497 (Supreme Court, February 14, 1990)
  • Appeals Committee (Jerusalem Administrative) 22899-10-22 Eisler v. Director of Real Estate Taxation, Jerusalem (May 27, 2025)
  • Yona De-Levi, Notary Law and Its History (2016, in Hebrew), Chapter Two: The Powers of the Notary