Your Neighbor Is Applying for a Building Permit in Israel: When You Can Object, Until When, and What to Do If Construction Has Already Started

קו אור מצייר שני בתים וקומה נוספת מרחפת בין בתים ירושלמיים בשחר

By Adv. David Bodenheim, Partner, Head of Litigation | Published: October 21, 2026

Not every neighbor may object to every permit. If the application includes a relief (Hakala) or a non-conforming use, the owners and holders of the adjoining properties receive notice, and they have 15 days to object (Section 149 of the Planning and Building Law). If you are co-owners in the same building or on the same parcel, the applicant needs your consent or must send you notice, and then too there are 15 days (Regulations 36 and 37 of the Licensing Regulations). A permit that conforms to the zoning plan on a neighboring lot is not open to objection. And since 2025 the reliefs themselves have been greatly narrowed: as a rule, additional floor area, apartments or floors can no longer be obtained by way of relief.

In Jerusalem these questions come up all the time: older buildings built under plans that are decades old, additions on the roof, protected rooms (Mamad) beyond the building line and dense streets where every meter affects the neighbor. This article explains how to identify which situation you are in, what can still be approved by way of relief, how the Appeals Committee in Jerusalem decides, and what to write in an objection.

Key points

  • A relief or a non-conforming use: publication, a sign on the facade and personal notice to the adjoining owners. Objections are filed within 15 days (Section 149(a)).
  • Co-owners in the same building or parcel who did not consent: 15 days from receipt of the notice (Regulations 36 and 37).
  • A plan-conforming permit on a neighboring lot: the neighbors have no right to object (AAA 1461/20 Antrim, Supreme Court).
  • Since 2025 a relief cannot add floor area, apartments or floors (Section 151(b)(1)), except for a track for a building whose construction was completed at least eight years earlier (Section 147(b)).
  • The Appeals Committee in Jerusalem rejects a relief that has no planning justification, or reliefs that accumulate into a building different from the one the plan permitted.

The neighbor is applying for a permit

Are you allowed to object?

Three situations, three different rules.

01You can object

A relief or a non-conforming use

  • Who: owners and holders of the property and of the adjoining properties
  • When: 15 days from publication, or from the day the personal notice was received
  • How: a reasoned planning objection, preferably with an expert opinion

Section 149 of the Planning and Building Law

02You can object

Co-owners in the same building or parcel

  • Who: a holder of a right in the land who did not consent to the application
  • When: 15 days from the day the notice was received
  • Note: building on the common property without consent may stop the application

Regulations 36-37 of the Licensing Regulations

03No objection

A plan-conforming permit on a neighboring lot

  • The rule: neighbors and the public have no right to object to the permit
  • What you can do: object already when the plan is deposited, within two months
  • And if the permit deviates from the plan: an administrative petition

AAA 1461/20 Antrim (Supreme Court)

Building without a permit?Contact the enforcement unit of the local committee with documentation. The chairman or the engineer may issue an administrative stop-work order (Section 216).

How do you know whether you have a right to object?

The first question is not “does the construction bother me” but which application was filed and what your connection to the property is. The answer determines whether there is any proceeding at all in which you can be heard.

The situationWho may objectThe deadlineThe source
The application includes a relief or a non-conforming useOwners and holders of the property and of the adjoining properties, and anyone the committee believes may be harmed15 days from publication, and for whoever received personal notice, from the day it was deliveredSection 149(a)
You are co-owners in the same building or parcel and did not sign the applicationA holder of a right in the land, such as an apartment owner in a condominium or an owner in undivided co-ownership (Musha)15 days from receipt of the noticeRegulations 36 and 37
A plan-conforming permit on a neighboring lotThere is no right to objectThe objection should have been made at the plan stageAAA 1461/20; Sections 100 and 102
A small deviation that the licensing authority approves without a relief, such as exceeding the side or rear setback by up to 7%There is no objection proceedingAn approach to the committee, and if necessary a petitionSection 145(b)(2); Regulation 6

What can still be requested by way of relief, and what no longer can?

Until recently a relief was the accepted way to add a floor, building percentages or an apartment to a building. The reform reversed the default: the local committee may grant a relief only in the matters prescribed in regulations, and they will not include the addition of floor area, housing units or floors (Section 151(b)(1)). For a plan that it was decided to deposit from January 1, 2023, the rule applies immediately, and for older plans it applies to applications filed from January 1, 2025. Earlier applications continue under the old rules (Regulation 8 of the Relief Regulations).

The permitted matters are listed in Regulation 4 of the Planning and Building (Relief, Non-Conforming Use and Deviation from a Plan) Regulations, 5783-2023, and most of them are narrow: a front building line according to the majority of the buildings on the street; a protected room, a shelter, an elevator shaft or emergency stairs as an addition to an existing building beyond the building lines; accessibility adjustments; and a reduction of parking under the parking regulations. For an existing building whose construction was completed eight years or more before the application, a wider track remains, provided there is no substantial deviation (Section 147(b)). In a plan deposited after August 1, 1989, any addition to the total floor area is a substantial deviation (Section 151(b)(2)).

And there are deviations that do not reach the neighbors at all. The licensing authority may approve, without a relief proceeding and without publication, deviations whose effect is “slight and negligible” according to an opinion of the committee engineer (Section 145(b)(2)), for example exceeding the side or rear setback by up to 7%, or up to 5% in site coverage (Regulation 6).

After the reform of reliefs, which came into force in stages up to 2025

Relief from a plan: what can still be requested today

What is allowed by way of relief, what is forbidden, and what is approved without publication.

01Can be requested

Allowed by way of relief

  • A front building line according to the line on which most of the buildings on that stretch of street are built
  • A protected room, a shelter or an elevator shaft as an addition to an existing building, beyond the building lines
  • Emergency stairs, accessibility adjustments and a reduction of parking under the regulations

Regulation 4 of the Relief Regulations, 2023

02Forbidden

Not by way of relief

  • Additional floor area
  • Additional apartments
  • Additional floors
  • Exception: an existing building whose construction was completed at least 8 years before the application, without a substantial deviation

Sections 151(b)(1) and 147(b)

03No publication

Without a relief and without an objection

  • Exceeding the side or rear setback by up to 7%
  • A deviation of up to 5% of the lot area in site coverage
  • Up to 2 meters in height for technical installations, without floors
  • Only on an engineer’s opinion that the effect is negligible

Section 145(b)(2), Regulation 6

Check firstA relief that is not on the list, or that involves a substantial deviation, is a question of authority. That is the strongest argument an objector has.

The practical meaning: when a notice of a relief arrives, first check whether the committee is competent to approve it at all. A relief that is not on the list, or that involves a substantial deviation, is a question of authority and not of discretion, and that is an objector’s strongest argument.

How does the Appeals Committee in Jerusalem decide?

Four considerations recur in the decisions of the Jerusalem District Appeals Committee: planning justification, the extent of the relief, the age of the plan (an older plan justifies more flexibility) and the harm to the neighbors and the public. “The more significant the extent of the reliefs requested, the more the scales tip against approving them” (Appeal (Jerusalem) 1021/23). Three decisions illustrate this. Two were given under the rules that preceded the reform, but the considerations hold today as well.

  • A floor without justification (Appeal 415/15 Levita). In a two-story building under Plan 62 of 1959, a floor, three apartments and an elevator were requested by way of reliefs. The Appeals Committee held that “the rule is plan-conforming construction and the exception is the approval of a relief,” and that where there is no planning justification, harm to the neighbors’ view and privacy is enough to reject. It also found that the decision to approve had been recorded after the fact, following a site visit that was not documented, and that the publication carried a wrong address.
  • Reliefs that accumulate (Appeal 1021/23, Beit Yisrael). On a parcel of about 111 sq m, a building of six apartments was requested, some of them of about 30 sq m, with several reliefs in parallel. The third floor was approved, but the accumulation of reliefs was found to depart from the character of the built fabric, and the building was reduced to four apartments. The arguments about the view were not decisive. Density and the harm to conservation were.
  • Without an expert opinion (Appeal 1118/25, the Bukharan Quarter). The appeal against two new apartments on the roof of a building designated for conservation was dismissed, among other reasons because “no expert opinion was filed with the Appeals Committee on behalf of the appellants as to the alleged harms.” The objectors nevertheless kept their sukkah balconies.

What emerges from this? General arguments about view and light in a dense neighborhood rarely succeed. What works is concrete harm proven by an expert opinion, the absence of planning justification, an accumulation of reliefs, and defects in the proceeding itself. It is therefore worth asking the committee for the minutes and the professional opinions, and not only for the decision.

What do you write in an objection?

A recommended outline for a written objection

  1. Who you are. Owners or holders, and the location of the apartment in relation to the lot (adjoining, opposite, above).
  2. What was requested. The application number and each relief separately, as it appears in the notice.
  3. Authority. Whether the relief is on the list of permitted matters, and whether it involves a substantial deviation.
  4. The harm. Light, air, privacy, setbacks, parking or the character of the street, with photographs, measurements and a rendering.
  5. Justification. Why the rights can be realized without the relief, or with a smaller relief.
  6. Alternatives. Moving a window, a setback, lowering or shifting a protected room. Committees tend to accept a well-founded intermediate solution.
  7. A request for a site visit. When the harm is visible only from inside the apartment, a visit is worth more than any description.

Mistakes that recur: a general objection without detail; an argument of loss of value without an appraiser’s opinion; proprietary arguments alone when the application concerns a neighboring lot; an objection to construction of a kind the objector himself benefited from in the past; and missing the deadline.

You are co-owners in the same building or on the same parcel

An application for a permit requires the consent of the holders of rights in the land: in a condominium the apartment owners or the house committee (Va’ad Bayit), and in land that is not a condominium the registered owners (Regulation 36(f)). Whoever did not consent receives notice and may object within 15 days (Regulations 36(b) and 37), and the licensing authority must decide on the objection in a reasoned decision (Regulation 43).

The planning institutions do not decide proprietary questions, but they may hold up an application that lacks “proprietary support,” for example building on a roof that remained common property (AAA 2832/09 Givatayim v. Bnei Eliezer). The applicant must show a “reasonable proprietary possibility.” And note the rule in the Land Law: “An owner of an apartment that was extended shall be regarded as having consented to a similar extension of any other apartment in the same building” (Section 71B(c)). Thus, in French Hill the Appeals Committee rejected an objection to a protected room on the common property, among other reasons because some of the objectors had themselves extended their apartments, and it regarded protection as a public interest “of the first order” (Appeal (Jerusalem) 1030/24). On a building that is not registered as a condominium, see our article on a building in undivided co-ownership (Musha).

The neighbor is building according to the plan. Can it be stopped?

At the permit stage, usually not. In AAA 1461/20 Antrim (2021), a developer applied for a plan-conforming permit for a hotel in Ein Kerem, and the neighborhood committee objected. The Supreme Court held that only a holder of a right in the land who received notice may object to such an application. The place where anyone who may be harmed is entitled to object is the deposit of the plan, within two months (Sections 100 and 102). As Amnon Lehavi explains, only when the permit deviates from the plan does a right of objection open to the neighbors at the licensing stage. He also notes that compensation under Section 197 applies to harm from a plan and not to harm from a relief on an adjacent lot. So against a neighbor’s relief, the objection is usually your main protection.

If the permit in fact departs from the plan, that is an argument about its legality: you approach the committee engineer, and if necessary consider an administrative petition within 45 days and without delay (Regulation 3 of the Administrative Affairs Courts Regulations). And whoever wants to have an influence early needs to follow the plans deposited in the neighborhood. See objecting to a zoning plan.

Construction has already started

Check in the building file whether there is a permit and what it allows. If there is none, or the construction departs from it, contact the enforcement unit of the local committee with dated photographs. The chairman of the committee, the committee engineer or the National Enforcement Unit may issue an administrative stop-work order, and in an urgent case a temporary order for five days (Section 216). Whoever is harmed by the order may apply to have it set aside within 15 days, but the application itself does not stay its execution (Section 228). And if the neighbor asks to legalize after the fact construction he has already carried out, the Supreme Court has emphasized that such an application must be examined “with seven eyes,” that is, with the greatest care (AAA 3319/05 Ponte). For building on the common property there is also a proprietary route before the Superintendent of Land Registration or the court (Section 72 of the Land Law). What you do not do: physically block the works.

A neighbor who wants to object to a relief or a non-conforming use

From the notice to the court

The timetable of an objecting neighbor.

  • 1

    Start

    Notice

    Publication in a newspaper, a sign on the facade and a letter to the owners and holders of the adjoining properties.

    Section 149(a)

  • 2

    15 days

    15 days to object

    From the day the notice was delivered, or from publication. In writing and with planning reasons.

    Section 149(a), Regulation 37

  • 3

    Hearing

    The committee’s decision

    A hearing on the objection. The decision is sent by registered mail.

    Section 149(a)(3)

  • 4

    30 days

    Appeal

    30 days from service of the decision. The Appeals Committee decides within 30 days.

    Section 152(a)(1), (c)

  • 5

    Up to 45 days

    Administrative petition

    Up to 45 days, without delay. It examines legality, not planning.

    Regulation 3

Building without a permit?Contact the enforcement unit with dated photographs. The committee may issue an administrative stop-work order (Section 216).

If you live abroad

Our office can file the objection, appear before the committee and the Appeals Committee and handle the proceeding on your behalf, under a power of attorney signed before an Israeli consul, or before a local notary with an apostille.

Frequently asked questions

I received a registered letter about a permit application. How much time do I have?

In most cases 15 days: for a relief or a non-conforming use, from the day the notice was delivered (Section 149(a)), and when you are co-owners of the land, from the day the notice was received (Regulation 37). Do not wait until the end of the period.

The neighbor is asking for an additional floor by way of relief. Is that still possible?

In applications to which the reform applies, no (Section 151(b)(1)). For a building whose construction was completed at least eight years earlier there is a wider track, but without a substantial deviation (Section 147(b)). And applications under older plans that were filed before 2025 may be handled under the previous rules.

The neighbor is asking for a protected room beyond the building line, opposite my window. Is there any point in objecting?

A protected room as an addition to an existing building is a matter that may be approved by way of relief (Regulation 4), and the Appeals Committee in Jerusalem gives it great weight. An objection aimed at preventing it altogether has low prospects. What can be achieved is a change of location, shape or openings, mainly when a concrete alternative is presented with a drawing.

I did not receive notice, but I live right next to the lot. What do I do?

The Law requires notice to the owners and holders of the adjoining properties (Section 149(a)(2A)). Contact the committee immediately in writing, state that you did not receive notice and ask for your objection to be heard. If a decision has already been given, an appeal or a petition should be examined without delay.

The committee rejected my objection. What next?

An appeal to the Appeals Committee within 30 days of the day the decision was served (Section 152(a)(1)). The Appeals Committee examines the matter anew, and its decision replaces the decision of the local committee. See appealing a decision of the local committee.

Can an objector be ordered to pay costs?

Yes, if the objection was filed in bad faith and is vexatious and frivolous. On the other hand, when the objection is justified, the developer can be ordered to pay the objector’s costs (Section 106(d)).

Received notice of a neighbor’s application? We will check the deadline and the prospects with you

Our firm represents apartment owners, neighbors and neighborhood committees in objections to reliefs and non-conforming uses, in appeals and in administrative petitions, and also permit applicants who need to respond to objections. We represent clients throughout Israel and abroad, mostly by phone and video.

For an initial review: +972-2-509-0170
Adv. David Bodenheim, Partner at Bodenheim Gabriel & Co., Head of Litigation, leads the firm’s planning and building and administrative law practice. Represents residents, neighborhood committees, communities and property owners in objections, appeals and administrative petitions. Gained experience in the litigation department of Herzog Fox & Neeman. Our planning and administrative law practice. Read also: A Leak from the Upstairs Neighbor: Who Is Responsible? Bodenheim Gabriel & Co., 214 Jaffa Street, Jerusalem.

This article is intended for general information only and does not constitute legal advice or a substitute for it. The deadlines and rules depend on the type of application, the date it was filed and the applicable plan, and each case is examined on its circumstances. Last updated: October 2026.

Main sources

  • Planning and Building Law, 5725-1965, Sections 100, 102, 106(d), 145(b)(2), 147, 149, 151, 152, 216 and 228
  • Planning and Building (Relief, Non-Conforming Use and Deviation from a Plan) Regulations, 5783-2023, Regulations 4, 6 and 8
  • Planning and Building (Building Licensing) Regulations, 5776-2016, Regulations 36, 37 and 43
  • Administrative Affairs Courts (Procedure) Regulations, 5761-2000, Regulation 3
  • Land Law, 5729-1969, Sections 71B and 72
  • AAA 1461/20 Antrim Investments (Israel) Ltd. v. Jerusalem Local Planning and Building Committee (Supreme Court, May 4, 2021)
  • AAA 2832/09 Givatayim Local Planning and Building Committee v. Bnei Eliezer Ltd. (Supreme Court, January 9, 2011)
  • AAA 3319/05 Alegria Ponte v. Be’er Sheva Local Planning and Building Committee (Supreme Court, August 1, 2005)
  • Appeal (Jerusalem District Appeals Committee) 415/15 Levita v. Jerusalem Local Committee (January 2016)
  • Appeal (Jerusalem) 1021/23 Edri et al. v. Jerusalem Local Committee (October 11, 2023)
  • Appeal (Jerusalem) 1030/24 Levi et al. v. Jerusalem Local Committee (May 7, 2025)
  • Appeal (Jerusalem) 1118/25 Fahima et al. v. Jerusalem Local Committee (January 13, 2026)
  • Amnon Lehavi, “Planning Injuries and Nuisances: On the Regulation of Spatial Externalities in an Age of Regulation,” 4 Law and Business (5766, in Hebrew)